Manufactur standard 500 Watt Led Flood Light - MarvoTM Flood Light - E-Lite
Manufactur standard 500 Watt Led Flood Light - MarvoTM Flood Light – E-Lite Detail:
LED Chip & CRI |
Lumileds 3030 / RA>70 |
|||||
Input Voltage |
AC100-277V Or 277-480V |
|||||
CCT |
3000K & 4000K & 5000K |
|||||
Beam Angle |
120° |
|||||
IP & IK |
IP66 / IK10 |
|||||
Driver Brand |
Sosen Driver |
|||||
Power Factor |
0.95 minimum |
|||||
THD |
20% Max |
|||||
Housing |
Die-cast Aluminum |
|||||
Work Temp |
-30°C ~ 50°C / -22°F~ 122°F |
|||||
Mount Option |
U Bracket / Slip Fitter / Side Arm / Trunnion / Knuckle |
|||||
Warranty |
5 Years Warranty |
|||||
Certificate |
ETL DLC5.1 CB CE RoHS |
|||||
Model |
CCT |
Power |
Efficacy(IES) |
Total Lumen |
Dimension |
Net Weight |
EL-MVFL-MW (80/100/150)T -MCCT(3K/4K/5K) |
5000K |
150W |
140LPW |
21,000lm |
338.5×323×80mm 13.3×12.7×3.15in |
3.5kg / 7.7lbs |
100W |
148LPW |
14,800lm |
||||
80W |
150LPW |
12,000lm |
||||
4000K |
150W |
150LPW |
22,500lm |
|||
100W |
158LPW |
15,800lm |
||||
80W |
160LPW |
12,800lm |
||||
3000K |
150W |
135LPW |
20,250lm |
|||
100W |
143LPW |
14,300lm |
||||
80W |
145LPW |
11,600lm |
FAQ
Q1: Are you a manufacturer or trade company?
E-LITE: We are a professional factory with over 15 years R&D and manufacture experience base on ISO quality management.
Q2. How to change different wattage to CCT?
E-LITE: The Marvo Flood light with 80W/100W/150W multiple wattage and 3K/4K/5K different CCT, by the controller switch to choose wattage and CCT.
Q3. How about the lead time of flood fixture light?
E-LITE: 5-7 days for sample order, 15-25 days for mass production order base on order quantities.
Q4: How do you ship the finished products?
E-LITE: By SEA, AIR or Express (DHL, UPS, FedEx, TNT, etc.) are optional.
Q5: Is it OK to print my logo on led light?
E-LITE: Yes, OEM service available, we can help to make the label and color box according to your requirements.
Q6: How to proceed an order for led light?
E-LITE: Firstly, please let us know your detail requirement and application environment, secondly we will recommend some suitable products and solutions to you according to your request. Thirdly, after confirm all the details, customers will issue the purchase order and make the payment to confirm, and then we start for the production and arrange the shipment.
Q7: How to deal with the claim?
A: Firstly, Our products are produced in strict quality control system and the defective rate will be less than 0.2%.
Secondly, during the guarantee period, we will send new lights with new order for small quantity. For defective batch products, we will repair them and resend them to you or we can discuss the solution including re-call according to real situation.
Product detail pictures:
Related Product Guide:
The organization upholds the philosophy of "Be No.1 in good quality, be rooted on credit history and trustworthiness for growth", will keep on to provide previous and new customers from home and overseas whole-heatedly for Manufactur standard 500 Watt Led Flood Light - MarvoTM Flood Light – E-Lite , The product will supply to all over the world, such as: Palestine, Hyderabad, Afghanistan, We believe that good business relationships will lead to mutual benefits and improvement for both parties. We now have established long-term and successful cooperative relationships with many customers through their confidence in our customized services and integrity in doing business. We also enjoy a high reputation through our good performance. Better performance will be expected as our principle of integrity. Devotion and Steadiness will remain as ever.
By Hedda from Buenos Aires - 2017.10.27 12:12
As an international trading company, we have numerous partners, but about your company, I just want to say, you are really good, wide range, good quality, reasonable prices, warm and thoughtful service, advanced technology and equipment and workers have professional training, feedback and product update is timely, in short, this is a very pleasant cooperation, and we look forward to the next cooperation!
By Page from Hungary - 2018.09.29 13:24